Skip to content
Fields of activity

Field of activity

Defence industry

We are evaluating opportunities for cooperation in facility, engineering and technology projects for the defence industry.

We first look at the need, the conditions of the facility or the work, and the operating arrangement. We then talk with manufacturers and engineering firms about ways of working together.

Evaluation sheet

Field
Defence industry
Work topics
04
Report stages
04
Questions looked at
05

Report entries

Work topics

Each of the four topics is a separate entry in the report. Every entry opens with the same question: where does this work take place, under what conditions and with whom?

  1. Entry01

    Facility

    Feasibility and infrastructure studies for production, maintenance and test facilities

    The location, layout and surroundings of production, maintenance and test facilities are considered together. Needs such as power, water, access and workshop floors are put on the table in the first stage of the feasibility study. An investment decision then does not rest on a missing assumption. The findings are written into the report in plain language.

    Questions we look at

    • Site and access: where can the facility be built and how is it reached?
    • Infrastructure: how are the needs for power, water and ground met?
    • Layout and flow: by which route do work and materials move through the facility?
  2. Entry02

    Training

    Technical training and simulation software

    Technical training aims to build an environment in which users learn the way of working before they start the job. For simulation software we first describe the content of the training, the simplicity of the screens and the user group. The choice of technology comes after that. Where the training environment will be set up is recorded in the same entry.

    Questions we look at

    • Content: which subjects and which group of users does the training cover?
    • Scope: what does the simulation show and what does it leave out?
    • Setting: where and with which tools is the training given?
  3. Entry03

    Quality

    Project work on quality control, testing and certification processes

    The places where measurement, trial and recording take place are thought of as one chain within the project. Which measurement is made where, and how the results are stored, is clarified from the start. The certification process rests on these records too. The aim is to set up an order that can be traced.

    Questions we look at

    • Test and maintenance areas: where are they and how do they relate to production?
    • Measurement: which measurement is made at which point?
    • Records and documents: how are results stored and turned into documents?
  4. Entry04

    Partnership

    Joint project development with manufacturers and engineering firms

    In joint project development we first discuss what the parties want to do together, who will take on the work and how information will be shared. Talks with manufacturers and engineering firms begin once the need of the project is clear. Each party takes responsibility in its own area.

    Questions we look at

    • Roles: who takes on which task?
    • Flow of information: what is shared with whom, and how?
    • Responsibility: how are operation and ongoing work managed?

Four-stage report

Four stages of a project

However different facility and engineering projects are, they pass through similar stages. We keep the report by these stages; each stage continues from the record of the one before.

  1. Stage 01Plan

    Design and feasibility

    What the project responds to, the conditions it will work in and a first layout are drafted. The feasibility study looks at whether that draft can be put into practice.

    Record entered in the reportFeasibility note and first layout draft

  2. Stage 02Site

    Facility and infrastructure

    The ground, energy, water and access conditions of the site are considered. How the maintenance and test areas will stand beside production is the subject of this stage.

    Record entered in the reportSite and infrastructure assessment

  3. Stage 03Test

    Testing and quality control

    Where the test rigs, measuring devices and control points will stand is planned. How quality control will run without disturbing the production flow is drawn up.

    Record entered in the reportMeasurement points and record arrangement

  4. Stage 04Papers

    Certification process

    Which documents will gather the results of tests and checks, and how they will be shared with the parties concerned, is made clear. Which institutions the process will run with is discussed separately for each project.

    Record entered in the reportDraft of the document flow

Checklist

Which questions do we look at?

These are the questions that come to the table when a facility or engineering project is evaluated. Their weight changes with the project, and all of them are kept on the table.

  1. Site

    Where will the facility be built, and how will it relate to its surroundings and to access?

  2. Infrastructure

    Do the conditions of power, water, communication and ground meet the needs of the operation?

  3. Process flow

    In what order and by which route do work, materials and people move through the facility?

  4. Test and quality records

    Which measurements will be made, how will results be recorded and how will they become documents?

  5. Partners

    Which sharing of roles and which form of cooperation is possible with manufacturers and engineering firms?

Method

How a project proceeds

In a new project we first examine the need, the investment conditions and the operating model. We then talk with manufacturers and engineering firms. Each step rests on the record of the one before.

  1. Step 01

    Defining the need

    What the project responds to and whose need it meets is written down.

  2. Step 02

    Site and infrastructure review

    We look at whether the land, energy, water and access suit the investment.

  3. Step 03

    Operating model

    Who will operate the facility or the work, and in what arrangement, is weighed.

  4. Step 04

    Test and quality framework

    Which measurements will be made and how records will be kept is drafted.

  5. Step 05

    Identifying the partners

    It becomes clear which manufacturers and engineering firms will be approached.

  6. Step 06

    Cooperation talks

    Options for working together are discussed with the parties and weighed jointly.

Options for evaluation

Partnership models

The following are not offers but options that can be weighed together in a project. Which one suits is decided by the need and the parties.

  • Option

    Joint project development

    The parties design the project together from the start; roles and responsibilities are set in the joint work.

    FocusSharing of roles and flow of information

  • Option

    Facility and infrastructure partnership

    The location, infrastructure and operating arrangement of a facility are handled with the contribution of more than one party.

    FocusSite, infrastructure and operation

  • Option

    Technical training partnership

    The training content and the simulation environment are shaped together with educational institutions and software teams.

    FocusContent and setting

  • Option

    Engineering consultancy cooperation

    We work with engineering firms on a single subject, such as the layout or the test arrangement.

    FocusA close look at one subject

Parties

Who we work with

Talks run with four kinds of party. Roles matter more than names; who comes to the table is decided by the need.

  • Manufacturers

    They know the production arrangement and the operating needs most closely; talks begin with their need.

  • Engineering firms

    These are the parties we work with on technical subjects such as design, layout and test arrangement.

  • Educational institutions

    These are parties that can shape the content of technical training and the simulation environment together with us.

  • Local businesses

    These are parties that can contribute to the supply, service and maintenance needs around the facility.

Concepts

Short glossary

Plain meanings of the concepts used on this page.

Feasibility
The study of whether a project can be put into practice before it is built.
Infrastructure
The basic systems a facility needs to work, such as power, water, roads and communication.
Simulation
Imitating a real way of working on a computer, without taking any risk.
Quality control
Checking regularly whether the work done meets the measures that were set.
Test
Trying out how a part, a rig or a system works under given conditions.
Certification
Showing the measurements and checks that were made through records and gathering them in documents.
Maintenance
The regular work done to keep a facility or a machine in working order.
Joint project development
Several parties designing a project together and sharing the roles.

Frequently asked questions

The answers give general information; each project is evaluated separately under its own conditions.

What does this page cover?

Opportunities for cooperation in facility, engineering and technology projects. There are four work topics: feasibility and infrastructure for facilities, technical training and simulation, quality control and test processes, and joint project development.

Where does a project begin?

The first step looks at the definition of the need, the site and infrastructure conditions, the operating arrangement and the test and quality framework. Options for working together are then discussed with manufacturers and engineering firms.

How is the first contact made?

A short message through the form on the contact page is enough. Your message is read, and which talks are needed is decided together according to its scope.

What is useful to share?

The subject of the project, its location or the location in mind, its scope and the form of cooperation you are looking for make the evaluation easier. A short note on the present situation also helps.

In which languages can we talk?

The pages are prepared in Turkish, Arabic and English. You can write your message in any one of them.

Can we also talk about a single topic?

Just one test rig, one training software or a single facility study can also be the subject of an evaluation. Which talks are needed is decided together, according to the scope.

What happens when I send a proposal?

The proposal is evaluated together with the questions on this page. No outcome is promised at this stage; the aim is to find common ground on which the subject can be discussed together.

Do you have a proposal for the defence industry?

Share the subject and scope of the project and the form of cooperation you are looking for; let us evaluate the proposal together.

What is useful to share

  • The subject of the project
  • Its location or the location in mind
  • Its scope
  • The form of cooperation you are looking for